Projects and delivery
Complete projects, from the first scoping workshop to the day your team takes over.
End to end
We manage the scope, the schedule, the suppliers, the testing and the handover. One person is answerable for the project, from the first meeting to the day your own team runs it. IT recruitment in the region is narrow and people move. If the project needs skills you do not have, we recruit locally and manage those people. They can stay with you afterwards. We work the way a foreign head office expects: written down, traceable, ready for someone else to pick up.
What we cover
- ERP and business systems: selection, rollout, data migration, user adoption
- Cloud and infrastructure: design, build, migration from the servers in your own office
- Integration between tools that were not designed to work together
- Websites and business applications, built for entry-level Android phones first
- Software development and product ownership
- Systems that have to work in Khmer, Thai, Lao, Vietnamese or Indonesian, not only in English
- Local recruitment and team building, for the project or for the long term
- Programme management across several suppliers
How a project runs
01
Scoping
We write down what the project must do, who it is for, and what stays out of scope. In many companies here the real decisions are taken quickly and in person, then never recorded. Writing them down is most of this phase, and it produces a short document you can read and correct.
02
Design and supplier choice
We turn the scope into requirements, compare the options, and recommend one. Where a supplier is needed we write the request, read the answers, and say what each one is really offering, including who answers the phone in Phnom Penh, Bangkok, Ho Chi Minh City, Vientiane or Jakarta when something breaks.
03
Build
Work runs in short cycles, each ending with something you can see. We test on the devices and networks your users really have: entry-level Android phones, uneven connections, power that cuts. Progress is reported against the plan, problems named.
04
Acceptance testing
Your own users test against the scope document, in the language they work in, not against a demonstration in English. We write the test cases, run the sessions, and track every defect to closure before go-live.
05
Go-live and handover
We plan the switch, including how to go back if it fails. Then we train the people who will run the system, in their own language, and hand over documentation their successor can also use. We stay available while your team settles in.
What you receive
- A scope document, in plain language, agreed before work starts
- Requirements your suppliers can work to, and be held to
- A plan with dates, dependencies, and the risks that could move them
- A written comparison of the options we looked at, and why some were set aside
- Test cases, test results, and a defect list closed before go-live
- A data migration plan, with the checks that prove the data arrived complete, names in both scripts
- Documentation and training in your users' own language, and reporting in the language your head office reads
- A handover report: what was built, what was left out, and what to watch next
Client-side project management
Most project failures are not technical. The scope was never written down. No supplier was held to a date. Users were never trained. We take the client-side role, including with your existing suppliers: reviewing their proposals, testing their work and approving it. That means asking for the evidence behind a progress report, and refusing a delivery that does not match what was agreed. An outsider does this more easily than a colleague who has to work with the same people next year.
Can you take over a project that is already in trouble?
Yes, and the request is a common one. We begin by establishing the real state of the work, which is rarely the state in the last report: what exists and works, what exists but does not, and what was only ever announced. Often the developer who built it has left the country or stopped answering, and nothing was written down. We then say plainly what can be saved, what should be rebuilt, and what should be stopped. Sometimes the useful answer is that the project should not continue in its present shape, and we would rather say so early than late.
What we need from you
- One person on your side who can decide, or who can reach the person who decides
- Access to the users whose work the system will change, not only to management
- The time for acceptance testing, booked in advance and protected
- Honest information about what the current systems really do, spreadsheets and paper included
- A decision when we ask for one, in writing: one taken quickly in a meeting or on Telegram does not survive the month
Working across the region, and with your head office
We work in Cambodia, Thailand, Vietnam, Laos and Indonesia, and we travel for the phases that need people in the same room: scoping, testing, go-live. The rest runs remotely, for clients anywhere in the world. Our hours overlap Europe in the afternoon and the Americas very little, so decisions are prepared in writing rather than settled in one call. Head offices and donors ask for reporting in their own format and on their own calendar. A project that ignores this is reopened later, so we plan that reporting from the start.
The people who will run the system after us
A system only one person understands is a risk, and in a market where IT staff move often, a short-lived one. We document for the successor, not for ourselves: how the system is installed, what usually breaks, who to call. Where you want people on your own payroll, we recruit them in the region, train them on the system they will operate, and manage them until they can stand alone. Where you would rather not hire, the same people can stay with Mekong Digital Cambodia and keep the system running.